Geevah Trading | The Home of Awesome Finds in Trinidad & Tobago
Menu
Your Cart

L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery

L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
L37 4G GPS Kids Smart Watch – Real-Time Location Tracker, Video Calling, SOS Emergency Button & 800mAh Battery
  • Advanced 4G Connectivity for Seamless Communication: The Fitwell L37 Kids Smart Watch harnesses the power of 4G connectivity, allowing your child to make video calls, ensuring that communication is not just limited to voice calls. This advanced feature enhances the overall communication experience, enabling parents and children to connect in a more immersive and visual way, fostering a sense of closeness even when physically apart.
  • Worldwide Real-Time Tracking for Ultimate Security: Keeping a watchful eye on your child has never been easier with the Fitwell L37's global real-time tracking capability. This feature utilizes GPS technology to provide accurate and instantaneous location updates. Parents can monitor their child's whereabouts effortlessly, ensuring they are always aware of their safety and well-being, whether at school, home, or during outdoor activities.
  • Capture Every Moment with the Built-in Camera: The integrated camera on the Fitwell L37 Kids Smart Watch allows your child to capture special moments, fostering creativity and self-expression. Parents can also remotely view the surroundings through the watch's camera, providing an added layer of security. This feature not only encourages your child's artistic side but also ensures that parents can keep an eye on their surroundings.
  • SOS Alarm for Immediate Assistance: Safety is paramount, and the Fitwell L37 understands this. The SOS alarm feature provides an instant connection between your child and you in case of emergencies. With a simple press of a button, the watch initiates a call to a predefined number, ensuring that help is just a touch away. This feature empowers children to seek assistance when needed, offering both parents and kids peace of mind.
  • Intuitive Touch Screen Interface: Navigating the Fitwell L37 is a breeze thanks to its user-friendly touch screen interface. The intuitive design ensures that even young children can operate the watch effortlessly. This feature encourages independence and allows kids to explore the watch's functionalities with ease, making it an enjoyable and educational experience.
  • Pedometer for Healthy Activity Tracking: Promoting an active and healthy lifestyle, the Fitwell L37 Kids Smart Watch is equipped with a built-in pedometer. It encourages children to stay active by tracking their steps throughout the day. Parents can monitor their child's activity levels, ensuring they are getting the recommended daily exercise for a balanced and healthy lifestyle.
  • Anti-Lost Functionality for Added Security: Children can be playful and adventurous, and the Fitwell L37 ensures that parents stay connected even when their little ones are exploring. The anti-lost feature alerts parents when the watch is out of a predefined range, minimizing the risk of accidental separation and providing an additional layer of security in crowded or unfamiliar places.
Cash on Delivery Available – No Credit Card Needed!
TTD449.00
Cash on Delivery Available – No Credit Card Needed!
  • Stock: Only 4 left in stock

Estimated Delivery Date: 18 November 2026

Warranty: 8–28 days manufacturer defects.***

SPECIAL OFFERS

X
FLASH SALE — 25% OFF!

Your Next Great Deal Is Here!

Save 25% on selected items. 

View item

BUY 1, GET 1 FREE!

Twice the Value. Same Price!
Don't miss out on this amazing deal. Get an extra item FREE when you shop selected BOGO deals!